How to choose construction scheduling software
Start with the job, because these tools split three ways: building and updating the CPM schedule, running the weekly plan with the trades, and using AI to generate a schedule or forecast whether the current one will hold. Most GCs on large work end up with one tool from the first group and maybe one from another.
After the job, check two things. The first is file format. P6’s XER and Microsoft Project’s MPP are what the other tools read, so anything you buy should import one or both and, if your owner wants P6 files, export XER. The second is how the bill grows. Microsoft charges per user. Outbuild charges by annual construction volume, Touchplan per project package, SmartPM by number of projects, and the rest quote after a call. Outside Microsoft, unlimited users is common, and that matters more here than in most categories, because a lookahead only works if the supers and trade foremen can log in and update it.
Pick a CPM tool for the baseline, the monthly updates and the delay arguments, since none of the AI tools here replaces it. Primavera P6 is the safe choice when owners, public agencies or your own schedule specs assume XER files. Microsoft Project costs far less to put on a few desks and covers critical path from Plan 3, but nothing in it is built for construction, and if you were on Project Online you’ve already had to move, since Microsoft retired it on September 30, 2026. Asta Powerproject sits between them, with 4D BIM, concurrent licences and a free trial you can download today.
AI is thin in this group. Oracle’s P6 page names no AI feature, Asta’s AstaGPT is advertised without a description, and Microsoft’s Copilot drafts plans and status reports as a paid add-on.
Pull planning and lookahead: Touchplan and Outbuild
Use one of these when the foremen from each trade build the weekly plan with you. Touchplan is built for the Big Room session, and BoardScan turns a photo of the sticky-note wall into digital tickets. Outbuild ties the CPM schedule to field coordination in one place, imports your existing P6 or Project file, and adds AI agents for schedule questions and health checks. If you want one tool for the master schedule and the field, start with Outbuild. If your lean team already pull plans on a wall and the master schedule lives in P6, Touchplan fits in beside it.
AI that generates schedules or forecasts schedule risk
This group answers questions a CPM tool can’t. nPlan forecasts the uncertainty on each activity and can generate a first-draft schedule from a scope. ALICE takes your existing schedule and simulates alternate sequences to find a faster or cheaper build, and says it’s generally used on projects of at least $75M. SmartPM builds nothing but scores schedule health, compares revisions and runs delay analysis across a portfolio, without calling it AI.
All three sit on top of your P6, Project or Asta file. Ask each vendor to run one of your real schedules in the demo, because a clean sample file shows you nothing about how it handles your logic.
- A sub or small GC with one scheduler: Microsoft Project on Plan 3, or Asta if you want 4D and a trial first.
- A mid-size GC that wants one cloud tool for the office and the field: Outbuild, and check that its XER export satisfies your owners.
- A GC on public or owner-specified work: P6 for the contract schedule, with Touchplan or Outbuild for the lookahead.
- An ops or executive team watching many jobs: SmartPM on top of whatever your schedulers use.
- A pursuit or megaproject team: nPlan for risk forecasts and draft schedules, ALICE for sequencing on very large jobs.
If you’re choosing the platform your schedule has to connect to, see the construction management software guide.